ELR Industries, a venture of Ellora Get a quote
  1. Home
  2. Fleet & Logistics
05Fleet & Logistics

Delivered on time, in the right sequence

Transit mixers, boom and stationary pumps, and a dispatch team that plans the pour with you so the site never waits for concrete.

An ELR transit mixer on the plant apron at GaulaneELR transit mixer · Gaulane
A

The fleet

Numbers from the Ellora Group plant and machinery register, August 2026.

Transit mixers
18x 6 m³
Boom pumps
236 m, 42 m
Stationary pumps
250 m³/hr
Self-loading
24, 2.8 m³
B

Plan a pour

Enter the volume, the pour rate and the distance from the plant. The planner works out loads, trucks in rotation and the pour duration.

Pour planner

10Mixer loads
4Trucks in rotation
3Pour duration (h)
70Truck cycle (min)

Cycle = loading + round trip at city speeds + unloading at the pour rate, with 6 m³ loads. A planning aid; dispatch confirms the schedule for every order.

Quote this pour

C

How a delivery day runs

Just-in-time delivery, planned the day before and followed truck by truck.

  • 01

    Confirm the order

    Grade, volume, pour rate, pump need and site access are agreed a day ahead.

  • 02

    Schedule the mixers

    Trucks are sequenced to the pour rate so concrete arrives as the previous load finishes.

  • 03

    Load and dispatch

    Each truck is loaded, weighed and sent with its delivery docket.

  • 04

    Track to site

    Dispatch follows every truck; delays are communicated before they matter.

  • 05

    Place and return

    Pump or chute placement, washout at the plant, drum ready for the next load.

Service area

Nashik and the surrounding region

Supplied from the plant at Gaulane, Nashik. The practical radius depends on the mix, the route and the pour timing. Share your site location with the enquiry and we will confirm delivery.

A truck crossing the weighbridge at the plant gate, with the weighbridge cabinEvery truck weighed at the gate